The 4 GeV CEBAF accelerator at Thomas Jefferson National
Accelerator Facility (Jefferson Lab) is arranged in a five-pass
racetrack configuration, with two superconducting radio-frequency
(SRF) linacs joined by independent magnetic transport arcs. The
1497 MHz continuous electron beam is composed of three interlaced
variable-intensity 499 MHz beams that can be independently directed
from any of the five passes to any of the three experimental halls.
Beam extraction is made possible by a system of nine warm sub-harmonic
separator cavities capable of delivering a 100 mrad
kick to any pass at a maximum machine energy of 6 GeV. Each separator
cavity is a half-wavelength, two cell design with a high transverse
shunt impedance and a small transverse dimension. The cavities
are powered by 1 kW solid state amplifiers operating at 499 MHz.
Cavity phase and gradient control are provided through a modified
version of the same control module used for the CEBAF SRF cavity
controls. The system has recently been tested while delivering
beam to Hall C. In this paper we present a description of the
RF separator system and recent test results with beam.
The 4 GeV CEBAF accelerator is arranged in a five pass racetrack configuration, with two superconducting radio-frequency (SRF) linacs joined by independent magnetic 180o transport arcs. The continuous electron beam is composed of three interlaced variable intensity beams that can be independently directed from any of the five passes to any of the three experimental halls. This allows three simultaneous experiments at the same or different energies and currents. Electrons are emitted through a thermionic cathode or a polarized laser cathode that is being commissioned. Presently only one experimental hall is fully operational, Hall C, with Hall A in the final commissioning stages.
To develop the three independent beams the CEBAF accelerator uses
a chopping cavity system in conjunction with separator cavities
operated at the third subharmonic (499 MHz) of the accelerating
cavities. The separator cavities are positioned in each of the
five passes and allow for different combinations of energy to
be delivered to the experimental halls. The accelerator can deliver
only a single lower energy (845, 1645, 2445, 3245 MeV) to any
one hall at a time or the maximum energy (4 GeV) to one, two or
all three experimental halls. Each pass has been designed to deliver
the 100 mrad kick necessary to extract
the beam. The separator phase arrangements for the first through
fourth pass and fifth pass are shown in Fig. 1.
The nine cavities are arranged in the following fashion: pass one and two each have one cavity, pass three and four each have two cavities and the final fifth pass has three cavities (Fig. 2). The reason is that it was more economical to build cavities than to buy high power amplifiers. In addition the arrangement allows for energy upgrade in the future without the addition of hardware.
The cavities are powered by six solid state amplifiers
that can be manually switched to any cavity in any pass. The most
amplifiers that will be needed at any one time is five, so one
acts as a hot spare. Eventually it is envisioned to have an electromechanical
switch matrix for drive and probe cables so that one can switch
remotely between passes.
The CEBAF separator cavity is a new design which
achieves a high transverse shunt impedance in a package with compact
transverse physical dimensions [1]. Two B field coupled /2 cells
make up each separator cavity. Each cell is a resonant cylindrical
cavity with four internal coplanar field perturbing rods that
are parallel to the cavity axis (Fig. 3). As reported in other
papers the cavity is operated in a TEM dipole type mode at 499
MHz and the beam path is along the cavity axis [1, 2]. The frequency
of each cell is adjusted by a manually operated capacitive frequency
tuner. Power is delivered to the separator cavity by a critically
coupled inductive copper loop probe mounted to a 1 5/8" coaxial
EIA adapter. Cavity gradient is measured by a small highly undercoupled
monitor loop probe.
The separator cavity is constructed from two cylinder body assemblies, one center flange/rod assembly and two end flange/rod assemblies. These parts are then joined together using Conflat vacuum hardware.
The flange/rod assemblies are quite intricate [3]. The rods are made from a tellurium copper alloy for strength and are brazed into an OFHC copper end slug. The end slug is brazed to a stainless steel collar which is then electron beam welded to a stainless steel Conflat flange (Fig 4). The entire assembly is then copper plated. Water channels in each flange assembly deliver coolant to the rods, which are hollow and fitted with septum plates. A water channel also surrounds each cylinder body.
An interesting feature of the cavity is that the stainless steel
cylinder body does not require copper plating. The fields and
therefore the currents are very weak at the cavity perimeter,
making plating irrelevant. Tests made during prototyping showed
that copper plating the cylinder body resulted in less than a
5% increase in the intrinsic Q. This amounted to a substantial
cost savings in manufacturing the cavity.
CEBAF Separator Cell | |
Length | 27.6 cm |
Radius | 14.6 cm |
Beam pipe diameter | 1.43 cm |
Rod diameter | 2 cm |
Rod gap longitudinal | 2 cm |
Rod center transverse spacing | 3.5 cm |
Cavity resonant frequency | 499 MHz |
Cavity loaded Q | 2500 |
Transverse shunt Impedance | 350 M/m |
Separator Cavity Transverse Shunt Impedance
The transverse shunt impedance is an important figure
of merit for a deflecting cavity, and we have determined this
value through three separate means. The first method was to perform
a MAFIA code simulation of the cavity. Next we conducted a beam
test with an installed separator in the accelerator, where we
measured the beam deflection. Finally, a bead pull measurement
was conducted in the lab [4]. Given the complicated geometry we
believe the MAFIA results are in fairly good agreement with the
other two methods.
MAFIA
Beam Test*
Bead Pull*
The amplifiers for the system were built by a private
company on contract with Jefferson Lab. They are of a modular
design that moves away from the traditional chassis style used
by many high power solid state amplifiers. The amplifiers are
capable of 1300 W of saturated power and 1 kW of linear power.
The amplifiers are modeled after broadcast amplifiers where quick
repairs are a necessity. Each amplifier has four (250 W) power
modules that can easily be removed for repair. In addition the
power modules can be removed and the amplifier operated with one,
two, or three modules to reduce the power consumption. Each power
module is identical and can be switched between amplifiers if
necessary. The amplifiers can be controlled either locally for
maintenance or remotely through the CEBAF control system during
operation. Interlocks consist of a load-missing fault for personnel
safety and over temperature to protect the unit.
Power out (linear) | 1 kW |
Power out (saturated) | 1.3 kW |
Frequency | 499 MHz +/- 5 MHz |
Class | A |
Gain | 70 dB |
VSWR (in/out) | 1.3:1/1.5:1 |
Noise figure | < 8.0 dB |
Cavity control is accomplished through a modified
superconducting (SC) cavity control module [5]. In a superconducting
mode the cavity provides the first pole in the feedback system.
In the normal conducting case that is not feasible since the cavity's
bandwidth is 200 kHz. Therefore the control modules have been
designed to include a removable artificial pole at 10 Hz. This
allows high gain (30 dB) operation without the possibility of
oscillation. The control system is based on a traditional phase
and amplitude system that controls on each individually. The signal
processing components were chosen to minimize AM to PM and vice
versa. We have not had problems with the SC cavities and therefore
do not foresee any problems with normal conducting cavities.
Calibration
The RF control modules are unique in that each is
calibrated in an environmental chamber. The modules are completely
characterized to remove offsets, phase shifts, and amplitude shifts.
A complete record of temperature drifts is then downloaded into
the control module where custom algorithms use the information
to compensate for them. Local operational information such as
cable attenuations and cavity coupling parameters are downloaded
to the control module in situ.
Software control
The EPICs control platform provides the user interface
in the form of control displays and state machine logic [6]. Because
there are only six RF control modules and nine separator cavities,
operators must have ability to switch RF controllers between the
cavities. This posed a dilemma for the RF controls because each
RF control module needs to have operational data (cable attenuations,
cavity Q) specific for each cavity. To facilitate this
a matrix database has been developed that allows operators to
download any operational information to any RF control module.
Interlocks
The CEBAF accelerator is set up so that any experimental
hall can have a number of different options of beam energy and
current. Hall B in particular will require currents three to four
orders of magnitude lower than the other halls. Any beam reaching
this hall that is larger than 1mA
could destroy the target; therefore an interlock is needed such
that the separator phase cannot slip 120o. In addition
directly downstream are very thin septa magnets that are susceptible
to beam burn through. A phase slip of 20 degrees could put the
beam onto one of the thin septa, causing a vacuum accident. Therefore
a fast shutdown system that compares the chopping cavity phases
to the separator cavity phase is being installed and tested.
Presently all of the cavities are installed and have
been tested to 1 kW. The phase slip interlock is undergoing beta
testing and it is expected to be fully operational by January
1997. Operations with beam have also been successful. The system
has been used to deliver 4 GeV, 70 mA
beam to Hall C while concurrently delivering 845 MeV, 5 mA
beam to Hall A. Multibeam delivery to all three experimental halls
is planned for early 1997.
[1] C. Leemann and G. Yao, "A Highly Effective Deflecting Structure", 1990 Linear Accelerator Conference, Albuquerque, New Mexico.
[2] R. Kazimi et al., "CEBAF's New RF Separator Structure Test Results", 1993 Particle Accelerator Conference, May 1993.
[3] A. Krycuk et al., " Construction of the CEBAF RF Separator", 1993 Particle Accelerator Conference, May 1993.
[4] J.N. Corlett, "Impedance of Accelerator Components", 1996 Beam Instrumentation Workshop, Argonne, Illinois.
[5] S. Simrock, "The CEBAF RF Control System", 1991 Particle Accelerator Conference, San Francisco California.
[6] W.A. Watson III, "The CEBAF Control System",
1995 Particle Accelerator Conference, Dallas Texas.